Promeco

Production units

Promeco operates production facilities in Finland and Poland. Our units work closely together as part of an integrated production network.

Promeco units on map

Promeco Production Units

Promeco has five production units in four locations. Click a location on the map to view more information about each unit.

Each unit has its own area of expertise, while working as part of an integrated production network. Together, our locations combine electrical and mechanical manufacturing capabilities to ensure efficient delivery, consistent quality, and flexible support for demanding industrial projects.

Production unit Pansia

SEP specializes in low-volume, highly demanding electrical assemblies, while HPD focuses on volume production of drive systems and related electrical solutions. The unit’s capabilities cover the full scope from engineering and manufacturing to testing and commissioning.

Pansia has extensive experience in Factory Acceptance Testing (FAT) and classification processes with marine classification societies. The local team includes engineering, project management, procurement, and logistics, supporting efficient project execution.

Close cooperation with the Yrityspuisto unit enables the integration of electrical and mechanical manufacturing within the same production process.

Key facts

Location: Kankaanpää, Finland
Employees: 241
Production area: 9,500 m²

Core business

  • Manufacturing of control systems
  • Switchboards
  • Motor control centers
  • Drive systems

Applications

Contact Us

Pasi Vanhatalo

Pasi Vanhatalo

Production Unit Director, Kankaanpää

Promeco Kankaanpää

Promeco Oy (VAT FI18640129)

Mettälänkatu 91,
P.O. Box 116
FI-38700 Kankaanpää, FINLAND

Production unit Yrityspuisto

The Yrityspuisto unit specializes in electromechanical manufacturing, with a strong focus on sheet metal processing, welded structures and the volume production of drive systems and related electrical solutions for demanding industrial applications.

Its manufacturing capabilities include laser cutting, punching, bending, machining and friction stir welding (FSW), as well as robotic welding and manual welding processes such as MIG, TIG and spot welding.

Friction stir welding enables the production of lightweight aluminum structures, particularly for railway applications where weight reduction is essential. Quality assurance is ensured through dimensional verification using 3D measuring tools.

The unit’s capabilities cover the full scope from engineering and manufacturing to testing and commissioning. It also has extensive experience in Factory Acceptance Testing (FAT) and classification processes with marine classification societies.

The unit works closely with the Pansia production unit, enabling seamless integration of mechanical structures and electrical assemblies within the same production process.

Key facts

Location: Kankaanpää, Finland
Employees:165
Production area: 10,500 m²

Core business

  • Mechanical enclosures and structures
  • Sheet metal assemblies
  • Aluminum structures
  • Cubicles and housings
    • Main Switchboards
    • Switchboards

Applications

Contact Us

Pasi Vanhatalo

Pasi Vanhatalo

Production Unit Director, Kankaanpää

Promeco Production Unit Yrityspuisto

Promeco Oy (VAT FI18640129)

Asemakatu 34,
FI-38700 Kankaanpää, FINLAND

Production unit Vaasa

Production unit Vaasa is located in one of the largest energy technology hubs in the Nordic countries. The Vaasa region brings together energy technology companies, universities, and research organizations focused on innovation and development.

The Vaasa unit specializes in sheet metal manufacturing and mechanical assemblies for demanding industrial applications. The team also supports customers with mechanical engineering and on-site installation services.

Through collaboration with other Promeco units and partners, the Vaasa team can deliver comprehensive electromechanical solutions for complex industrial projects.

Key facts

Location: Vaasa, Finland
Employees: approximately 100
Production area: 9,600 m²

Core business

  • Mechanical assembly
  • Insulation solutions
  • Sheet metal products

Applications

Contact Us

Petri Koski

Petri Koski

Production Unit Director, Vaasa

Promeco Production Unit Vaasa

VM-Group Oy (VAT FI07851860)

Dynamotie 4 S,
P.O. Box 227
FI-65320 Vaasa, FINLAND

Production unit Gościcino

The Gościcino production unit combines electrical and mechanical manufacturing capabilities. Electrical assembly focuses on low- to medium-volume series production, while mechanical processes include bending, welding and mechanical assembly.

The unit also supports machine building projects where electrical and mechanical processes are integrated into comprehensive solutions ready for installation.

Promeco Sp. z o.o. also provides soft insulation solutions for marine and energy applications, using both manual and automated manufacturing technologies.

Key facts

Location: Gościcino, Poland
Employees: 150
Production area: 3,800 m²

Core business

  • Electrical cabinets
  • Mechanical assembly

Applications

Contact Us

Sebastian Bryczkowski

Sebastian Bryczkowski

Production Unit Director, Poland

Promeco Production Unit Gościcino

Promeco SP. z o.o. (VAT PL5882214176)

Klimka 10
PL-84-241 Gościcino, POLAND

Production unit Strzebielino

The Strzebielino unit focuses on mechanical assembly and manufacturing for industrial machinery applications. The facility supports both single-unit production and small-series manufacturing.

The unit complements the Promeco production network by providing additional capacity for mechanical assembly and industrial equipment manufacturing.

Key facts

Location: Strzebielino, Poland
Employees: 32
Production area: 1,050 m²

Core business

  • Mechanical assembly

Applications

Contact Us

Sebastian Bryczkowski

Sebastian Bryczkowski

Production Unit Director, Poland

Promeco Production Unit Strzebielino

Promeco SP. z o.o. (VAT PL5882214176)

Juliana Tuwima 3
PL-84-220 Strzebielino, POLAND