May 6, 2021 | Promeco Group Oy
At Promeco’s Vaasa unit, the change of factory layout had been on the plan for a while, until in summer 2020 it was time to roll up the sleeves. With the change, the production space was reduced 700 m² and the location of the welding area was reorganized to...